Fig. 01 · Primary bath
An arch,rediscovered.
A 1917 primary bath, stripped back to the studs and rebuilt around the plaster arch the original builders left behind.
- Neighborhood
- Boston-Edison
- House built
- 1917
- Duration
- 14 weeks
- Completed
- 2025

The story
- 01Full gut & re-plaster
- 02Custom white oak vanity
- 03Radiator restoration
- 04Unlacquered brass fixtures
Behind three layers of drywall and a 1980s fiberglass surround, we found the outline of the original plaster arch. The whole design grew out of that moment.
We re-formed the arch, wrapped it in handmade zellige, and set a cast-iron tub beneath it. The radiator was sandblasted, re-plumbed, and returned to the exact spot it has stood for a century.


Materials
- Tile
- Handmade zellige, dove gray
- Stone
- Calacatta Viola tub front
- Millwork
- Rift-sawn white oak